1、 Project Overview
Project Name: Design and Installation Engineering for Class 100000 and Class 10000 Cleanrooms
Project type: Design and construction of dust-free clean room
Project scale: Customized design and installation based on specific needs
2、 Project Content
1. Design content:
-Cleanroom layout design
-Design of Air Purification System
-Lighting system design
-Material selection and design scheme for floor, wall, and ceiling
-Design of special process equipment (such as air shower rooms, transfer windows, etc.)
2. Installation project:
-Cleanroom decoration construction
-Installation of air purification system
-Installation of lighting system
-Equipment installation (such as air shower rooms, transfer windows, etc.)
-Construction and installation of concealed works such as electrical and piping
3、 Project standards and requirements
1. Design standards: Follow the design specifications and standards of national and local dust-free clean rooms.
2. Air cleanliness: reaching the standard of 100000 or 10000 level clean rooms.
3. Material requirements: Use environmentally friendly materials that are corrosion-resistant, easy to clean, and fire-resistant.
4. Equipment requirements: Advanced air purification equipment should be used to ensure the air quality in the workshop.
5. Construction management: Strictly abide by construction safety regulations to ensure construction quality and progress.
4、 Service Process
1. Pre communication: Understand customer needs and provide preliminary design solutions.
2. Plan development: Develop detailed design and construction plans based on customer needs.
3. Contract signing: After both parties confirm the plan, sign the contract and pay the advance payment.
4. Design and construction: Design and construct the cleanroom according to the design plan.
5. Mid term inspection: Conduct quality checks during the construction process to ensure that the construction meets the design requirements.
6. Completion acceptance: After completing the design and construction, conduct completion acceptance to ensure that the clean room achieves the expected effect.
7. After sales service: Provide free maintenance and technical support services for a certain period of time.
5、 Precautions
During the design and construction process, it is necessary to strictly follow relevant standards and specifications to ensure the quality and safety of the cleanroom.
2. Maintain close communication with clients, provide timely feedback on design and construction progress, and ensure the project is completed on schedule.
3. Use high-quality materials and equipment to ensure the stability and durability of the cleanroom.
During the construction process, attention should be paid to protecting the environment and reducing the impact on the surrounding environment.
总之,承接10Class 10,000和Class 10,000Dust-Free RoomDesignInstallationEngineering及Class 10,000无尘Clean Workshop的任务需要高度的ProfessionalKnowledge和严谨的管理,需按照标准和规范进行Design和Construction,EnsureDust-Free Room的Quality和Safety性。
Undertake the design and installation project of a 100000 level cleanroom and a 10000 level cleanroom
Quick Answer: 承接10Class 10,000和Class 10,000Dust-Free RoomDesignInstallationEngineering及Class 10,000无尘Clean Workshop的任务是一项非常Professional且重要的工作,这涉及到精密的EngineeringDesign和严谨的Construction管理。以下是关于此Project的简要Overview和详细说明
This page URL:
Need a Custom Purification Engineering Solution?
Huajian Jing 10 years industry experience, fully qualified, global service, priority Hong Kong, free design